ABSTRACT
This research discusses a production scheduling by using flowshop type production scheduling with respect to transportation time, break-time and weight of jobs. The data used are four job scheduling on three machines. In addition, there is inter-machine transport time. The method was used in this research is NEH Method. Based on the results, the NEH method obtained a makespan value of 56 hours with a weighted mean flow time of 34.07 hours.
Support the magazine and subscribe to the content
This is premium stuff. Subscribe to read the entire article.



